ISC Group undertakes slab-on-grade concrete works for factories, warehouses, logistics facilities and service yards in Egypt. Execution is coordinated with the approved structural design and the floor’s intended use.

Slab-on-Grade Construction in Egypt

Concrete floors for warehouses and industrial sites

The package considers subgrade preparation, levels, reinforcement, concrete placement, joints and curing. Load requirements, slab thickness and reinforcement are determined by the approved design, not a generic installation formula.

Pour planning, joints and curing

We coordinate pour boundaries and joints with columns, entrances and equipment positions. Formation levels, compaction, reinforcement and embedded items are inspected before casting. Concrete finishing, joint cutting and curing follow the agreed sequence so that the slab is protected while it gains strength.

Questions about this service

Is a vapour barrier required beneath the slab?

The design, ground moisture and final floor finish determine that requirement. It should be confirmed before concrete is placed.

Will the concrete need a separate protective finish?

That depends on the intended use. Epoxy or another industrial flooring system may be specified after the concrete has been prepared.

Discuss your project with our technical team.

Share your project location, drawings, quantities and site photographs so we can review the requirements.