
New Administrative Capital, Egypt
Central Business District (CBD)
Foundation and raft waterproofing, cementitious systems, podium and tower roofs, and thermal insulation.
View projectISC Group applies cementitious waterproofing systems to suitable concrete tanks, basements, foundations and wet areas in Egypt. Surface condition, moisture exposure and the specified use are reviewed before selecting the coating.

Preparation includes addressing defective areas and detailing joints, corners and penetrations. Application and curing follow the selected system. Suitability for drinking-water contact or other special uses must be confirmed for the specific product.
Loose concrete and honeycombing are repaired before application. Wall-to-floor junctions and penetrations receive their specified details. Moving joints and active leaks need separate treatment; a coating alone does not resolve them. Surface moisture, layer application and curing follow the product requirements.
Cementitious waterproofing requires a compatible substrate, appropriate surface preparation, sound concrete and carefully treated junctions. The coating system must be selected for the specified water exposure. Cracks, honeycombing and active leaks may require separate repairs or injection before the main waterproofing coating.
Provide drawings, concrete condition, service use, expected water pressure and the approved specification. Compare crystalline concrete waterproofing and leak injection where relevant.
Explore each project’s location and delivered scope.

New Administrative Capital, Egypt
Foundation and raft waterproofing, cementitious systems, podium and tower roofs, and thermal insulation.
View projectThe specific product must be approved for drinking-water contact. Curing, cleaning and commissioning follow its instructions and the project specification.
The design, direction of water pressure, approved product and condition of the structure determine the application side.
Share your project location, drawings, quantities and site photographs so we can review the requirements.