
Riyadh · Saudi Arabia
King Khalid International Airport — T3 & T4
Epoxy coatings and conductive epoxy flooring, delivered by Injaz.
View projectISC Group installs epoxy flooring in Egypt for factories, warehouses, garages and service areas. We assess the concrete, traffic and operating conditions before recommending the thickness, texture and finish.

A floor specification should reflect vehicle traffic, cleaning, impact and the actual chemicals used on site. A thin coating and a high-build or self-leveling system have different roles. We review the existing slab and proposed duty before selecting the build-up and planning installation.
Vehicle areas need attention to tyre traffic, slip resistance, drainage, joints and line marking. Some applications require a dedicated traffic coating system. The final choice depends on whether the deck is internal or exposed, its movement and the required protection.
Where heat, cleaning or chemical exposure is demanding, compare polyurethane-cement and U-Crete flooring. Electrical control requirements may call for ESD flooring. A smooth finish can be considered through a specified self-leveling system.
A coating does not correct an unresolved moisture source or structural defect. Necessary concrete repairs should be coordinated before installation.
Our industrial flooring team can review the proposed operating environment and coordinate the work with your project programme.
Explore each project’s location and delivered scope.

Riyadh · Saudi Arabia
Epoxy coatings and conductive epoxy flooring, delivered by Injaz.
View projectYes, where the substrate can be brought to the required condition. Old coatings, oil contamination or moisture may require additional preparation or a different system.
The main factors include area, substrate condition, specified thickness, joints, finish and access. Share a floor plan and operating requirements for a scoped quotation.
The answer depends on preparation, the system and site conditions. Walking, vehicle use and full chemical exposure can have different release times, which should be agreed in the installation plan.
Share your project location, drawings, quantities and site photographs so we can review the requirements.